Midland, Texas, faces road closures amid utility infrastructure overhaul
9/25/2024
MIDLAND, Texas (UI) — Several roads in Midland are currently closed as the city progresses with key utility projects.
As of this week, Colorado Street between Texas Avenue and Wall Street has been closed for Atmos Energy's utility upgrades. This section is scheduled to reopen by Oct. 4.
North County Road 1160 is also closed from East County Road 90 to the Highway 80 frontage road to facilitate sewer line installations. This closure is expected to remain in place until Dec. 23.
Additionally, the ongoing closure on Garfield Street has now extended south to Louisiana Avenue for continued utility installations.
The City of Midland will release further updates as these projects advance.
Related News
From Archive
Sign up to Receive Our Newsletter
- OSHA investigates fatal trench collapse at Conroe construction site
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Texas811 launches real-time excavation detection to prevent utility strikes
- Oil pipeline struck during fiber optic construction spills into L.A. storm drains
- Fiber drilling strike triggers major sewer failure, lawsuits in Florida
- Fatal trench collapse in Mass. leads to $4.6 million OSHA penalty, dozens of violations
- Texas811 launches real-time excavation detection to prevent utility strikes
- Race Communications breaks ground on Bakersfield fiber network
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Inside Infrastructure: Utility locators warn of systemic failures in damage prevention process

Comments