Woolpert Chosen to Design Sewer Rehabilitation Project
4/10/2017
The Hampton Roads Sanitation District has selected Woolpert to provide study, design and administration services for a project to rehabilitate about one mile of sanitary sewer infrastructure in Newport News, Va.
The project includes 4,800 linear feet of gravity sewer pipeline and associated manholes along Jefferson Avenue from West Mercury Boulevard to 72nd Street.
The design of this project is now underway, with construction scheduled to begin in fall 2018.
Related News
From Archive
Sign up to Receive Our Newsletter
- Ohio trench collapse kills one worker, injures two during pipe installation
- Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings
- Dominion proposes 186-mile underground HVDC power line across Virginia
- Trump vetoes bill to finish $1.3 billion Colorado water pipeline
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- Massive water line failure leaves majority of Waterbury without service
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year
- Worm-like robot burrows underground to cut power line installation costs

Comments