U.S. Indian Bureau Violates Water Repairs Order
BILLINGS, Mont. (AP) — Federal environmental regulators say the U.S. Bureau of Indian Affairs violated an order to repair a public water supply system serving about 1,300 people on the Crow Indian Reservation in southeastern Montana.
Environmental Protection Agency (EPA) officials said in a letter obtained by The Associated Press that the bureau has repeatedly missed deadlines to complete repairs following concerns last spring about potential water contamination.
The Crow Agency water system provides drinking water to about 1,300 people. In March, a main line on the system broke, prompting an advisory for users to boil water or use alternate supplies as a precaution.
The concern was that loss of pressure because of the line break could have allowed contaminated water to seep into the system through cracks and joints.
EPA spokeswoman Lisa McClain-Vanderpool says the Bureau of Indian Affairs has completed enough required work that there is no longer an imminent public health danger. That included increasing the dose of disinfectant at the water treatment plant.
Still unfinished are repairs to a control system that would allow plant operators to monitor water levels, according to the Jan. 14 violation letter.
Bureau spokeswoman Genevieve Giaccardo said the agency was working to address the remaining problems.
“Having safe drinking water is fundamental to the health and wellness of Indian Country and facilities should meet basic standards,” she said in a statement. “We are actively working with the Tribe who administers federal funding at these facilities and the EPA to address these issues.”
In 2018 the EPA Inspector General’s office issued a report raising concerns about potential human health threats after evidence of contamination was found in water from the Little Bighorn River that supplies the Crow Agency system.
The river water is treated before entering the network of pipes that delivers water to Crow Agency residents.
Related News
From Archive
- OSHA issues 16 citations following fatal sewer confined space incident
- 27 pipeline safety violations tied to deadly Pa. chocolate factory explosion
- Contractor gas line strike triggers home explosion in Missouri
- LA recovery reports call for $650 million power line burial, major utility upgrades in Pacific Palisades
- Comprehensive microtrenching FAQ: Key insights on the Vermeer MTR516 microtrencher
- T-Mobile to expand fiber broadband infrastructure footprint with $4.9 billion Metronet acquisition
- First tunnel boring machines complete testing for Hudson Tunnel Project
- NWPX grows water infrastructure portfolio with Colorado precast facility
- Cityside launches $100 million fiber build in Corona, Calif.
- FiberLight to build 1,400-mile West Texas dark fiber network in $350 million expansion

Comments