NTSB: Valve leak fueled 2021 pipeline blast that killed 2
FARMERSVILLE, Texas (AP) — A valve leak and a spark of unknown origin combined to cause a North Texas natural gas pipeline explosion last year that killed two workers and injured two others, federal investigators said.
A report by the National Transportation Safety Board followed the agency’s investigation of the June 28, 2021, explosion near Farmersville, about 35 miles (55 kilometers) northeast of Dallas.
In the report issued Wednesday, the NTSB said a work crew was using a steel rod to insert an inline tool into the Atmos Energy pipeline when an explosion in front of the tool shot it from the chamber and at the workers standing in front of the door.
Investigators said they found scratches and gouges in a mainline valve seal in front of where the tool was, creating leak paths. Workers had suspected the leak existed the week before, tightened the valve until the leak stopped or was reduced to undetectable levels, then marked the valve’s position to avoid a recurrence.
The leak persisted, however, the NTSB said. Also, Atmos procedures and training did not prepare workers to recognize the developing hazard. Although the work crew had many years of collective experience, the workers were not qualified as required by federal regulations and were not using gas monitors to watch for a hazardous atmosphere, the board said.
Dallas-based Atmos has upgraded its procedures in response to the explosion, the NTSB said. Atmos officials did not immediately respond to a message seeking comment on the NTSB report.
Related News
From Archive
- Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings
- Trump vetoes bill to finish $1.3 billion Colorado water pipeline
- PHMSA warns of heat risks in aging plastic gas distribution pipelines following deadly Pennsylvania explosion
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- OSHA seeks $1.2 million fine after fatal trench collapse in Connecticut
- Worm-like robot burrows underground to cut power line installation costs
- First tunnel boring machines complete testing for Hudson Tunnel Project
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year
- NWPX grows water infrastructure portfolio with Colorado precast facility

Comments