Rhode Island seeks input on Woonsocket's clean water infrastructure replacement plan
(UI) — The Rhode Island Department of Health (RIDOH) has issued a public notice seeking feedback on the proposed 2023 update to the Clean Water Infrastructure Replacement Plan (CWIRP) for the City of Woonsocket Water Department.
The city of Woonsocket Water Department has drafted an updated CWIRP in compliance with Chapter 46-15.6 of the General Laws of Rhode Island and the "Clean Water Infrastructure Plan" Regulations (216-RICR-50-05-7). The complete updated document is available for review at the Rhode Island Department of Health's Center for Drinking Water Quality, located at Three Capitol Hill, Room 209, Providence, RI 02908, during regular weekday hours from 8:30 a.m. to 4:30 p.m.
Written comments on the proposed plan should be submitted to the Center for Drinking Water Quality either by mail or email to DOH.RIDWQ@health.ri.gov within 30 days of this notice.
Should a request for a public comment hearing on the proposed categorical exclusion be made by 25 persons, a governmental agency, or an association with no fewer than 25 members within 10 days of the publication of this notice, a hearing will be scheduled. If such a hearing is warranted, it will be open to the public, recorded, and held at least five days before the end of the public comment period. Requests for a public comment hearing should be directed to the Center for Drinking Water Quality.
If requested by 4:30 p.m. on February 23, 2024, a public comment hearing will take place as follows:
Date: March 14, 2024 Time: 11:00 a.m. Location: RIDOH Auditorium, Three Capitol Hill, Providence, Rhode Island 02908
Interested individuals are advised to contact RIDOH to confirm the scheduling of the hearing.
The public comment hearing will include a stenographic record, and the public record will remain open for seven days following the conclusion of the hearing to accommodate additional written submissions.
Related News
From Archive
- TxDOT advances massive drainage tunnel beneath I-35 in Austin
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- U.S. water reuse boom to fuel $47 billion in infrastructure spending through 2035
- $2.3 billion approved to construct 236-mile Texas-to-Gulf gas pipeline
- Major water pipe break in Puerto Rico hits over 165,000 customers
- Pennsylvania American Water launches interactive map to identify, replace lead water service lines
- Trump's tariffs drive $33 million cost increase for Cincinnati sewer project
- Utah city launches historic $70 million tunnel project using box jacking under active rail line
- Tulsa residents warned after sewer lines damaged by boring work
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized

Comments