Rhode Island seeks input on Woonsocket's clean water infrastructure replacement plan
(UI) — The Rhode Island Department of Health (RIDOH) has issued a public notice seeking feedback on the proposed 2023 update to the Clean Water Infrastructure Replacement Plan (CWIRP) for the City of Woonsocket Water Department.
The city of Woonsocket Water Department has drafted an updated CWIRP in compliance with Chapter 46-15.6 of the General Laws of Rhode Island and the "Clean Water Infrastructure Plan" Regulations (216-RICR-50-05-7). The complete updated document is available for review at the Rhode Island Department of Health's Center for Drinking Water Quality, located at Three Capitol Hill, Room 209, Providence, RI 02908, during regular weekday hours from 8:30 a.m. to 4:30 p.m.
Written comments on the proposed plan should be submitted to the Center for Drinking Water Quality either by mail or email to DOH.RIDWQ@health.ri.gov within 30 days of this notice.
Should a request for a public comment hearing on the proposed categorical exclusion be made by 25 persons, a governmental agency, or an association with no fewer than 25 members within 10 days of the publication of this notice, a hearing will be scheduled. If such a hearing is warranted, it will be open to the public, recorded, and held at least five days before the end of the public comment period. Requests for a public comment hearing should be directed to the Center for Drinking Water Quality.
If requested by 4:30 p.m. on February 23, 2024, a public comment hearing will take place as follows:
Date: March 14, 2024 Time: 11:00 a.m. Location: RIDOH Auditorium, Three Capitol Hill, Providence, Rhode Island 02908
Interested individuals are advised to contact RIDOH to confirm the scheduling of the hearing.
The public comment hearing will include a stenographic record, and the public record will remain open for seven days following the conclusion of the hearing to accommodate additional written submissions.
Related News
From Archive
- Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings
- Trump vetoes bill to finish $1.3 billion Colorado water pipeline
- PHMSA warns of heat risks in aging plastic gas distribution pipelines following deadly Pennsylvania explosion
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- OSHA seeks $1.2 million fine after fatal trench collapse in Connecticut
- Worm-like robot burrows underground to cut power line installation costs
- First tunnel boring machines complete testing for Hudson Tunnel Project
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year
- NWPX grows water infrastructure portfolio with Colorado precast facility

Comments