Maryland's Howard County begins sewer rehabilitation under Little Patuxent River
ELLICOTT CITY, Md. (UI) — Howard County has launched construction on a sewer rehabilitation project to replace and reconnect 150 feet of 12-inch pipe crossing the Little Patuxent River between U.S. 29 and Lake Kittamaqundi in Columbia.
The work involves replacing the existing line and tying it into the 42-inch interceptor sewer. The project aims to improve hydraulic performance, enhance reliability and prevent future sewer overflows, according to the Department of Public Works (DPW).
Weather permitting, construction is expected to be completed by January 2026.
DPW coordinated the project alongside the Columbia Association’s Lake Kittamaqundi dredging work to minimize disruption. Signage, closures and detours around the area will be managed by the Columbia Association.
Related News
From Archive
- OSHA issues 16 citations following fatal sewer confined space incident
- 27 pipeline safety violations tied to deadly Pa. chocolate factory explosion
- Contractor gas line strike triggers home explosion in Missouri
- LA recovery reports call for $650 million power line burial, major utility upgrades in Pacific Palisades
- Comprehensive microtrenching FAQ: Key insights on the Vermeer MTR516 microtrencher
- T-Mobile to expand fiber broadband infrastructure footprint with $4.9 billion Metronet acquisition
- First tunnel boring machines complete testing for Hudson Tunnel Project
- NWPX grows water infrastructure portfolio with Colorado precast facility
- Cityside launches $100 million fiber build in Corona, Calif.
- FiberLight to build 1,400-mile West Texas dark fiber network in $350 million expansion

Comments