PHMSA withdraws pipeline inspection guidance, citing overreach
(UI) — The U.S. Department of Transportation’s Pipeline and Hazardous Materials Safety Administration (PHMSA) has withdrawn a Biden-era advisory bulletin tied to the 2020 PIPES Act, citing federal overreach and excessive regulatory burdens on the pipeline industry.
The bulletin, originally intended to guide operators in implementing Section 114 of the PIPES Act, had been criticized for extending beyond the law’s scope and introducing costly new requirements. In a notice transmitted to the Federal Register, PHMSA formally rescinded the guidance.
“Eliminating red tape is at the heart of this administration's plan to maintain energy dominance,” said U.S. Transportation Secretary Sean Duffy. “President Trump’s aggressive deregulatory agenda is bringing down costs for consumers and unleashing a golden age of American energy.”
PHMSA Acting Administrator Ben Kochman added, “Section 114 provided clear direction to operators and PHMSA. That is why I am rescinding the prior administration’s Advisory Bulletin, which imposed new requirements outside the scope of existing regulations and statute."
Pipeline operators are now instructed to follow the original language of Section 114 and section 60108(a) of the Pipeline Safety Act in drafting inspection and maintenance plans. Regulators will use those standards during future audits and inspections.
Related News
From Archive
- OSHA issues 16 citations following fatal sewer confined space incident
- 27 pipeline safety violations tied to deadly Pa. chocolate factory explosion
- Contractor gas line strike triggers home explosion in Missouri
- LA recovery reports call for $650 million power line burial, major utility upgrades in Pacific Palisades
- Comprehensive microtrenching FAQ: Key insights on the Vermeer MTR516 microtrencher
- T-Mobile to expand fiber broadband infrastructure footprint with $4.9 billion Metronet acquisition
- First tunnel boring machines complete testing for Hudson Tunnel Project
- NWPX grows water infrastructure portfolio with Colorado precast facility
- Cityside launches $100 million fiber build in Corona, Calif.
- FiberLight to build 1,400-mile West Texas dark fiber network in $350 million expansion

Comments