South Haven, Mich., launches $42 million water infrastructure overhaul with lead pipe replacements
(UI) — The Michigan Department of Environment, Great Lakes, and Energy (EGLE) has partnered with the City of South Haven and the South Haven Area Water-Sewer Authority (SHAWSA) to kick off construction on a new elevated water storage tank.
The groundbreaking ceremony also highlighted over $42 million in investments in the region's wastewater and drinking water infrastructure.
These efforts are part of a broader initiative to upgrade South Haven’s water systems, funded by a combination of state and federal programs. SHAWSA secured financing through Michigan’s Clean Water State Revolving Fund (CWSRF) and the Drinking Water State Revolving Fund (DWSRF), with additional support from the American Rescue Plan Act (ARPA) and the Bipartisan Infrastructure Law (BIL).
In 2023, SHAWSA received a $5.8 million low-interest loan and a $3.6 million grant through the CWSRF to upgrade its wastewater treatment plant. These upgrades include replacing blowers and diffusers in the secondary treatment system and transitioning from chlorine to ultraviolet disinfection. To address flooding concerns, SHAWSA also secured a $1.5 million High Water Infrastructure Grant.
In 2024, SHAWSA received a $9.1 million grant and a $11.7 million loan from the DWSRF to fund various projects, including a new water storage tank, booster station, and lead service line replacement. Around 2,100 lead service lines will be replaced, removing all lead pipes from the city's distribution system within the next three years. The new elevated water tank will replace a 100-year-old structure, ensuring the city's safe drinking water supply.
Additionally, upgrades to the wastewater treatment plant aim to enhance its efficiency and help South Haven meet environmental standards by reducing the exceedances of discharge limits, protecting the Black River and Lake Michigan.
To date, Michigan’s SRF programs have financed over $9.4 billion in projects across the state to protect public health and the environment.
Related News
From Archive
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized
- Alaska LNG pipeline could require 7,000 workers at peak construction, developers say
- Ohio trench collapse kills one worker, injures two during pipe installation
- Elon Musk's Boring Co. fined for dumping drilling waste into Vegas sewer system
- $1.4 billion Midwest pipeline expansion to move more Canadian oil to U.S. Gulf
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized
- Massive water line failure leaves majority of Waterbury without service
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Pennsylvania American Water launches interactive map to identify, replace lead water service lines

Comments